12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 01520FIELD OFFICES AND SHEDSPART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The requirements of this section consist of furnishing, locating, and removing temporarystructures, equipment, and furnishings.1 .2 RELATED <strong>REQUIREMENTS</strong>A. Temporary Services - Section 01510.PART 2 PRODUCTS2 .1 CONTRACTOR'S FIELD OFFICEA. Contractor may provide an office for his own use. Size, location, and construction shall be subjectto approval by Contracting Officer.2 .2 STORAGE SHEDSA. Temporary weathertight sheds or other covered facilities for storage of materials subject toweather damage. Number and size of structures shall be subject to Contracting Officer's approval.PART 3 EX<strong>EC</strong>UTION3 .1 OTHER STRUCTURESA. Locate where directed by Contracting Officer, a minimum of 50 feet from permanent structures.3 .2 REMOVALA. Remove structures, equipment, and furnishings, and terminate services after punch list is 100percent completed or when directed by Contracting Officer.END OF S<strong>EC</strong>TION01520-111/07 FIELD OFFICES AND SHEDS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!