A. Preparation: Install soil retention blanket within 7 days of final grading. Areas to receive blanketshall be smooth, free of deep footprints, vehicle tracks and other major irregularities, as long asthere is contact between the blanket and the soil.B. General: Unroll the blanket on the ground, flat, with netting on top, without stretching, so that itlies loosely but smoothly in contact with the soil surface. Staple to the ground without gapping.C. Slopes: Use North American Green S150BN. Install blanket horizontally starting at toe of slope,overlapping undisturbed area below, 18 inches minimum. Place next upslope blanket, overlappingfirst blanket 6 inches. Staple in accordance with manufacturer’s instructions, stapling downslopeedge through upslope edge of lower blanket. Overlap final upslope blanket over undisturbed area18 inches minimum. Overlap end joints 6 inches minimum and staple.PART 4 MEASUREMENT AND PAYMENT4 .1 SOIL RETENTION BLANKETA. Payment will be included in the bid item to which this work relates.END OF S<strong>EC</strong>TION02370-2SOIL RETENTION BLANKET

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!