12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D. Transport and place bituminous mixture on the area to be paved in a manner that will minimizesegregation. Remove segregated areas behind the paver immediately and replace the segregatedmaterial with specification material before the initial rolling has taken place. The removal andreplacement of nonspecification material or unacceptable work shall be accomplished at noadditional expense to the Government.E. Place bituminous material as continuously as possible. Rollers shall not pass over the unprotectedend of a freshly laid mixture unless authorized by the Contracting Officer. Form transverse jointsby cutting back on the previous run to expose the full depth of the course. When directed, use acoat of bituminous material on contact surfaces of all joints just before additional mixture isplaced against the previously rolled material.3 .4 COMPACTING MIXA. After the bituminous mixture has been spread and struck off, and surface irregularities have beenadjusted, thoroughly and uniformly compact mixture by rolling.B. Roll surface when the mixture is in the proper condition and when the rolling does not causeundue displacement, cracking or shoving.C. The number, weight, and type of rollers furnished shall be sufficient to obtain the requiredcompaction while the mixture is in a workable condition.D. Continue rolling until all roller marks are eliminated and the minimum density specified has beenobtained.E. Any displacement occurring as a result of the reversing of the direction of a roller, or from othercauses, shall be corrected at once by the use of rakes and addition of fresh mixture when required.Care shall be exercised in rolling not to displace the line and grade of the edges of the bituminousmixture.F. To prevent adhesion of the mixture to the rollers, keep wheels properly moistened with water orwater mixed with very small quantities of detergent or other approved material. Excess liquid willnot be permitted.G. Along forms, curbs, headers, walls, and other places not accessible to the rollers, thoroughlycompact mixture with hand tampers or with mechanical tampers.H. Remove mixture that becomes loose and broken, mixed with dirt, or is in any way defective, andreplace with fresh hot mixture; compact to conform with the surrounding area.3 .5 PROT<strong>EC</strong>TION OF PAVEMENTA. After final rolling, no vehicular traffic of any kind shall be permitted on the pavement until it hascooled and hardened.3 .6 ACCEPTANCE <strong>REQUIREMENTS</strong>A. Surface Tolerance: The variation between any two contacts with the surface shall not exceed 3/16inch in 10 feet. Correct all humps or depressions exceeding the specified tolerance by removingdefective work and replacing it with new material at no additional expense to the Government.B. Density: Acceptable density of the in-place bituminous concrete pavement shall be 95 percent ofthe optimum values as determined from the job-mix formula. Field sampling and density12/97 02743-5ASPHALT CONCRETE PAVEMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!