12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Expansion Tanks: Air side precharge pressure. Measure pressure with tank isolated fromhydronic system pressure.6. Glycol: Measure the percent propylene glycol in chilled water system.PART 2 PRODUCTS2 .1 TEST INSTRUMENTS AND EQUIPMENTA. Provide all test instruments, meters, gauges, thermometers, power measuring instruments,pumping equipment, temporary piping, fittings, wiring, wiring devices, and miscellaneous itemsnecessary to perform the required testing procedures. All instruments shall be calibrated andcertified accurate.2 .2 ACCESSORY DEVICESA. Provide necessary dampers, thermometer wells, gauge cocks, balancing valves, and otherappurtenances as required. Coordinate with agency as to the locations of these items asconstruction progresses, to avoid disturbance to finished complete systems. Also provide newsheaves and belts for air moving equipment, if required, to attain desired air quantities.PART 3 EX<strong>EC</strong>UTION3 .1 <strong>GENERAL</strong>A. Study the drawings and specifications to ensure that all dampers, valves, and instrumentationnecessary for proper balancing and testing are shown or specified.B. Before commencing adjustment and balancing work, test and clean all systems; remove air fromwater system; conduct trial runs on equipment; and provide complete set of clean filters for theair-conditioning units.3 .2 CLEANING AND ADJUSTINGA. Clean pipes free of scale and thoroughly flush of all foreign matter. Provide temporary bypass forall water coils to prevent flushing water from passing through coils. Thoroughly clean strainersand valves.B. Thoroughly clean the inside of ducts, plenums, and casing of all debris, rubbish, and dust.Vacuum clean before installing outlet faces.C. Lubricate bearings with oil or grease as recommended by manufacturer. Tighten belts to propertension. Adjust fans to the speed indicated by the manufacturer to meet specified conditions.Adjust miscellaneous equipment to setting indicated or directed.D. Coordinate with the manufacturer's representative to adjust the automatically operated dampersand valves for required operation and to check all controls for proper calibration, operation, andfunction.3 .3 TESTING15952-3TESTING, ADJUSTING,AND BALANCING OF H&V SYSTEMS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!