12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S<strong>EC</strong>TION 02510PAVEMENT AND CONCRETE CURBSPART 1 - <strong>GENERAL</strong>1.01 S<strong>EC</strong>TION INCLUDESA. This section covers aggregate base course, bituminous pavement and concrete curbs.1.02 RELATED WORKA. Division 3 - Concrete1.03 QUALITY STANDARDSA. Governing Standards. Except as otherwise specified or shown, materials, equipment, andconstruction methods for pavement shall comply with the applicable provisions of Section 39of the Caltrans Standard Specifications.B. AASHTO M17, M140, M147, M208, M226, T89, T90, T96, T180.1.04 SUBMITTALSA. In accordance with Section 01330.B. Submit samples of aggregate and asphalt cement as required by General Standard.PART 2 - PRODUCTS2.01 AGGREGATE BASE COURSE AND BITUMINOUS PAVEMENTA. Aggregate base course:1. Class 2, ¾-inch maximum in conformance with Section 26, Aggregate Bases of theCALTRANS standard specifications.B. Bituminous Pavement:1. Type B, ½-inch maximum grading in conformance with Section 39, Asphalt Concreteof the CALTRANS standard specifications.C. Thickness shall be a minimum of 4-inches.PART 3 - EX<strong>EC</strong>UTION3.01 <strong>GENERAL</strong>A. Drives, parking areas, curb, and walks shall be constructed to the lines, grades, and crosssections indicated on Drawings. Type of construction shall be as indicated on the Drawingsand as specified herein.02510 - 111/07 PAVEMENT, CURBS, AND WALKS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!