12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2 .4 WIREWAYA. As shown. Formed from galvanized 14-gauge minimum sheet steel, complete with all fittings,plates, and closures; hinged latched covers. Rain tight wire way shall be provided with gasketedconduit hubs for top mounted equipment.2 .5 S<strong>EC</strong>ONDARY LIGHTNING PROT<strong>EC</strong>TORA. Section 16050.PART 3 EX<strong>EC</strong>UTION3 .1 SERVICE CONDUCTORSA. Install service conductors without splices.3 .2 SERVICE DISCONN<strong>EC</strong>TA. Install and ground in accordance with N<strong>EC</strong> and as shown.3 .3 WIREWAYA. Install the wire-way in accordance with N<strong>EC</strong> and as shown.3 .4 METERA. Utility Company KWH Meter is existing next to panel MP, no additional Utility Companymetering is required3 .5 CURRENT TRANSFORMERSA. No additional current transformers are required3 .6 TRANSFORMER AND EQUIPMENT PADSA. Construct pads as specified in Section 16050.3 .7 TRANSFORMERSA. Contractor to install transformers as shown and in accordance with manufacturer'srecommendations.END OF S<strong>EC</strong>TION16210-205/08 EL<strong>EC</strong>TRIC SERVICE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!