12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I. Separate demolition area from building to remain with temporary dustproof partitions.J. Provide temporary weather protection to prevent damage to structure and interior area.PART 2 - PRODUCTS2.01 MATERIALSNOT USEDPART 3 - EX<strong>EC</strong>UTION3.01 EXAMINATIONA. Verify that areas to be demolished are unoccupied and discontinued in use.B. Do not commence work until conditions are acceptable to Contracting Officer3.02 PREPARATIONA. Arrange for and verify termination of utility services to include capping lines.B. Remove items scheduled to be salvaged and place in designated storage area.3.03 DEMOLITIONA. Sprinkle debris and use temporary enclosures as necessary to control dust.B. Do not use water to the extent it causes flooding, contaminated runoff, or icing.C. Break concrete and masonry into sections less than 3 FT in any dimension. Sectioning ofconcrete that is to be hauled off-site by Contractor shall be left to the Contractor’s discretion.D. Plug or cap the abandoned piping and buried electric lines at the existing pump house andstorage shed. Note that buried electric line shall also be cut and plugged or capped at the northside of the Campground A Comfort Station.E. Removal of Existing Structures and Equipment – Refer to the historical Well and Pump Housedrawing at the end of this section for approximate dimensions, construction materials, andprocess equipment. Note that this drawing may not accurately represent existing conditions.1. Remove electrical, mechanical, furnishings and other appurtenances2. Fill and compact to 95% of maximum density, backfill to grade.3. Grade to match proposed subgrade4. Revise portions of existing structures as indicated on Drawings or otherwise specified.5. Any demolition occurring over an existing structure to remain, or over a structurecontaining liquid shall be done in such a manner that any or all items demolished willnot fall, causing damage to structure below or into liquid and possibly damagingequipment.6. The pit well in the existing pump house shall be protected from structural debris,piping, equipment, and all other materials that may fall into the water. Prior to02072-205/08 DEMOLITION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!