12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

less 20 percent to arrive at practical coverage usage. In situations of discrepancy betweenmil thickness on surface and coverage rates applied, mil thickness governs.C. Paint includes fillers, primers, sealers, emulsions, oils, alkyds, latex, enamels, thinners,stains, epoxies, vinyls, chlorinated rubbers, coal tars, urethanes, shellacs, varnishes, andother applied coatings.D. For unspecified materials such as turpentine or linseed oil provide best graderecommended by selected manufacturer.1.3 SUBMITTALSA. As specified in Section 01330.B. Paint Analysis: The Contractor shall perform a paint analysis of existing piping,appurtenances, and components to determine the paint material composition and colorfor each paint coating.C. Detailed product data sheets, recommended application procedures, and coverages.D. Samples: Complete range of colors for selection.E. Test Reports.1. Provide test reports of flame spread per ASTM E84-91aE1 for paints. Supply forpaints requiring ratings per NFPA 101-91.2. Provide performance and chemical test reports.F. Coating Test Panels: Field apply coatings to 12 IN x 12 IN test panel illustrating colorsand textures for each surface, material, color, and texture for Contracting Officersapproval.G. At project completion furnish two quarts of paint of each type and color used.H. At completion of project furnish final paint schedule documenting for each paint product,manufacturer, product name/number, color name/number or formula, and use inaccordance with Section 01330.1.4 DELIVERY, STORAGE AND HANDLINGA. Deliver in original containers, labeled as follows:1. Name or type number of material.2. Manufacturer's name and stock number.3. Contents, by volume, of major constituents.4. Application instructions.5. Warning labels.6. All unlabeled containers shall be removed from project site.09900-211/07 PAINTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!