12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A. Electrical Cabinet shall be NEMA 4X outdoor rated free standing 12 gauge welded steel panelwith integral mounting legs and back panel for equipment mounting. Panel shall have doubledoors with three point locking handles and piano hinges. Panel dimensions, 60”H, 48”W, 24”D,Hoffman #A-604824LP with A60P48 back panel, or approved equal. Accessories shall include:1. Panel Heater Kit, Hoffman # D-AH4001B 400 Watt 115vac heater, for condensationcontrol.2. Panel Lighting package, Hoffman # A-LTMB light package with manual switch andreceptacle.3. Panel Fan Kit, Hoffman # A-PA4AXFN 85CFM 115vac fan with exhaust grill and filter2 .11 WELL BUILDING WALL HEATERA. Electric Wall type unit heater with built in single pole thermostat and surface mounting frame.MARKEL Model HF3315TRP with frame 3310EX33R, or approved equal.2 .12 EL<strong>EC</strong>TRICAL PULL BOXESA. Precast polymer concrete Pull Box with Solid Bottom. Style PG/LG, Part NumberPC1730DA12 Manufacturer, Hubbell-QUAZITE or approved equal. Location as shown onplans.2 .13 TRANSFORMERSA. Transformers shall be rated as shown on Sheet E2 and shall have 2 2-1/2 percent taps above andbelow normal, on both primary and secondary windings. Transformers shall be Westinghouse,Sorgel or approved equal.2 .14 NAMEPLATES, LEGEND PLATES AND WIRE MARKERSA. Nameplates: Laminated sheet plastic, approximately 1/16-inch-thick, with engraved white letterson a black background, with adhesive backing and mounting-screw holes. Minimum height ofletters, 5/16 inch. Card holders are not acceptable.B. Legend Plates: NEMA Type KN-3 standard legend plates.B. Wire Markers: Pressure-sensitive or heat shrink sleeve types.PART 3 EX<strong>EC</strong>UTION3 .1 RACEWAY AND FITTINGS:A. Make cuts square, removing sharp edges.B. Run raceway plumb, level, and in a direct line, with long sweeping bends and offsets. Makechanges in direction of raceway with symmetrical bends or metal fittings. Bends shall not kink orreduce the internal diameter. Follow manufacturer's recommendations for handling, bending,coupling, and installing nonmetallic conduit.C. Make joints tight. Do not use nonconductive material at joint locations before joints are made.Provide expansion joints as necessary for PVC.16050-405/08 BASIC MATERIALS AND METHODS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!