DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. Welders whose qualifications have lapsed shall be requalified.1 .5 PROT<strong>EC</strong>TIONA. Cap all openings in pipes, valves, tanks, and equipment to protect against entry of foreign matteras work progresses.1 .6 PERMITSA. Contractor shall apply for and obtain all required state and local permits for the work to beperformed under this section.1 .7 SUBMITTALSA. As specified in Section 01330.B. Submit documentation and references regarding successful installation experience on propane gassystem projects.C. Submit a complete schedule of the materials and equipment to be provided. Includemanufacturer's literature on storage tank, tank fittings, pneumatic control system components,regulators, lp-gas dispenser, pipe and pipe fittings, valves, fire extinguishers, and flexible connectors.D. Submit detailed shop drawings showing layout of all system components and piping, includingelectrical work. Show locations and sizes of magnesium anodes for underground steel pipecathodic protection. Provide detail drawings for transport unloading bulkhead, tank foundations,retaining walls, and aboveground pipe supports. Detail drawings shall include reinforcing steelshop drawings showing reinforcing steel layouts, sizing, spacing, etc.E. Submit copies of proposed drawing for instruction panel.F. Submit design information for underground steel piping cathodic protection system. Submittalshall include manufacturer's literature for cathodic protection and monitoring components, anddesign parameters such as pipe coating efficiency, soil resistivity, soil pH, and redox potential.Cathodic protection system shall be designed for a 30 year minimum service life and the design ofthe system shall conform to National Association of Corrosion Engineers (NACE) RecommendedPractice RP0169-96.G. Submit calculations for tank foundation design.1. Design loads are based on 1997 UBC requirements.2. Live Loads - Vertical:a. Snow - 20 PSF3. Live Loads - Lateral:a. Seismic Zone 4b. Wind Loading - 80 MPH, Exposure B15480-2PROPANE GAS STORAGE SYSTEM AND APPURTENANCES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!