12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 3 EX<strong>EC</strong>UTION3 .1 PIPE APPLICATIONSA. Copper Pipe:1. Install Type L copper pipe with wrought copper fittings and solder joints for above groundpiping.3 .2 PIPING INSTALLATION, <strong>GENERAL</strong>A. Arrange piping in horizontal groups, each group to be in one plane. Maintain indicated slope.Conceal pipe installations in walls, pipe chases, utility spaces, mechanical rooms, above ceilings,below grade or floors.B. Install piping parallel to permanent elements of building. Provide space to permit insulationapplications, with 1-inch clearance outside insulation.C. Sloping, Air Venting, and Draining:1. Install piping true to line and grade, and free of traps and air pockets. Slope piping up indirection of flow at 0.2 percent grade.2. Provide eccentric reducers for changes in horizontal piping, top side flat.3. Connect branch piping to bottom of mains, except for up-feed risers which shall have takeoffsat top of main.4. Install manual air vents at high points in hydronic piping systems and at coils. Provide1/4-inch copper, 180-degree bend pipe to discharge vented water into can.5. Install automatic air vent on air separator. Provide valved inlet and discharge piped tofloor drain.6. Install drain valves with hose adapters at low points in mains, risers, and branch lines.Drain shall consist of tee fitting, 3/4-inch ball valve, and short 3/4-inch threaded nipple andcap. Provide drain valves for float type controllers.D. Fittings: Standard manufactured fittings. Field fabricated fittings and bushings are prohibited onall piping.E. Unions: Install unions in pipes 2-inch and smaller, adjacent to each valve, at final connections ofeach piece of equipment and elsewhere to permit alterations and repairs. Install dielectric unionsto join dissimilar metals. Unions are not required on flanged devices.F. Flanges: Install flanges on valves and equipment having 2-1/2 inch and larger connections.G. Pipe Ends: Cut pipe and prepare ends with full inside diameter. Deburr and size.H. Joints:1. Threaded Joints: Apply Teflon tape to male equipment threads. Do not use pipe withthreads which are corroded or damaged.15500-6HYDRONIC SYSTEMS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!