12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.6 DELIVERY, STORAGE, AND HANDLINGA. Protect pipe coating during handling using methods recommended by manufacturer. Use of barecables, chains, hooks, metal bars or narrow skids in contact with coated pipe is not permitted.B. Prevent damage to pipe during transit. Repair abrasions, scars, and blemishes. If repair of satisfactoryquality cannot be achieved, replace damaged material immediately.PART 2 - PRODUCTS2.1 MATERIALSA. Furnish piping, fittings and appurtenances meeting the requirements of this Section.B. Pipe sizes indicated are nominal inside diameter.C. Use straight, round pipe.D. For temporary piping not specifically addressed in Piping Schedule, utilize materials, joints andfittings equal to those specified for similar applications of permanent construction.2.2 COMPONENTS AND ACCESSORIESA. Protective Coating and Lining1. Where coatings, linings, paint, tests and other items are stated on schedules of service, pipeand fittings shall be included in referenced conditions.2. Where specified in piping schedule, provide coal-tar epoxy linings and coatings inaccordance with AWWA C203 (for steel pipe) and ANSI C151 (for ductile pipe) to aminimum thickness of 20 mils in not less than two coats.3. Where specified in piping schedule, provide cement mortar lining in accordance with AWWAC205 for steel pipe and AWWA C104 for ductile iron pipe.4. Ensure interior lining does not interfere with the operation of adjacent valves.5. Where specified in piping schedule, galvanize surface in accordance with hot-dip methodusing any grade of zinc acceptable to ASTM B6.6. Where specified in the piping schedule, field paint pipe in accordance with <strong>DIVISION</strong> 9 –FINISHES.7. For factory applied epoxy coatings, wrap exposed joints and fittings with coating tape asmanufactured by coating manufacturer.8. Equip with white faces, black numerals and black pointers.9. Provide pressure gages with pressure range of 200 percent of normal operation.10. Provide diaphragm seal housing of stainless steel construction.11. Assure gage accuracy to within 1 percent15060 - 304/08 PIPING AND PIPE FITTINGS: <strong>GENERAL</strong> STATEMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!