used in archeologically sensitive areas. Contractor shall ensure that approved Daily WorkSchedule is followed throughout construction.PART 2 PRODUCTS2 .1 BARRICADESA. Section 01560.PART 3 EX<strong>EC</strong>UTION3 .1 BARRICADESA. Construct as specified in Section 01560. Locate as directed by Contracting Officer.3 .2 OBSERVATIONA. Archeological Monitor will observe all ground-disturbing site work, including construction oftemporary facilities, at all archeologically sensitive areas, from a safe location mutually agreed onby Contractor and Monitor. As new ground is broken, Monitor will examine excavated materials,using construction layout centerline and perimeter staking as a reference point to record locationsof findings.3 .3 DISCOVERY OF RESOURCESA. If Archeological Monitor discovers resources, immediate relocation of the work to a nonsensitivearea may be required to allow Monitor to take soil samples and record resources. WhileArcheological Monitor is documenting resources in sensitive areas, Contractor shall relocatework to nonsensitive areas where monitoring is not normally required.B. If resources are discovered while Archeological Monitor is absent, stop work immediately andreport the discovery to the Contracting Officer.3 .4 WORK STOPPAGEA. The Contractor shall plan, schedule, and execute the work to prevent stoppages at one area fromstopping all work at the construction site.END OF S<strong>EC</strong>TION01350-202/08 ARCHEOLOGICAL PROT<strong>EC</strong>TION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!