12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. Under roadway crossings or pavements, moisture content to be 2 percent plus/minus ofoptimum moisture content, as specified in accordance with ASTM D698.2. In all other areas of trench construction, the moisture content will be adjusted by either thedrying of the materials or wetting of the material to a percentage required to obtain thecompaction as specified.3.06 PAVEMENTA. Temporary Backfill1. All trenches in or adjacent to the National Monument entrance road shall be temporarilybackfilled prior to darkness, weekends, and holidays.B. Permanent Pavement1. Permanent pavement shall conform to the requirements of the San Benito County andCALTRANS Standard Specifications.3.07 FIELD QUALITY CONTROLA. Testing1. Perform inplace moisture density tests as directed by the Contracting Officer to ensure trenchbackfill complies with specified requirements. Pay for all costs associated with compactiondensity tests. Where backfill compaction does not meet moisture density test requirementsand after backfill has been removed as directed by Contracting Officer and situationcorrected, perform additional tests as directed until compaction meets or exceedsrequirements.2. Moisture density tests are to be taken at a minimum of one test every 24 IN lift per 75 linealFT of trench.END OF S<strong>EC</strong>TION02320 - 604/08 UTILITY TRENCHING AND BACKFILLING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!