3.2 INSTRUMENT CALIBRATIONA. The contractor shall provide the services of a factory trained instrument technician, tools andequipment to field calibrate each instrument to its specified accuracy in accordance with themanufacturer’s specifications and instructions for calibration. Each instrument shall be calibratedat 10 percent, 50 percent and 90 percent of span using test instruments to simulate inputs and readoutputs that are rated to an accuracy of at least five times greater than the specified accuracy ofthe instrument being calibrated. Provide a written report to the Contracting Officer on eachinstrument certifying that it has been calibrated to its published specified accuracy. This reportshall include a listing of the published specified accuracy, permissible tolerance at each point ofcalibration, calibration reading as finally adjusted within tolerances, defects noted, correctiveaction required and correction made.3.3 SYSTEM TEST AND DEMONSTRATIONA. Upon completion of entire control system, contractor shall perform tests of all power and controlsystems in the presence of the Contracting Officer to demonstrate proper operation of all systems.Arrange with the Park to provide demonstrations of all system operations for all persons of theParks choosing. Tests shall show that all electrical and control systems are clean, faultless, andfree from mechanical and electrical defects. The contractor shall provide one-half day of start-upassistance after acceptance of the work by a qualified instrumentation engineer to insure that theParks operating personnel are properly trained in the system operation.3.4 OPERATION AND MAINTENANCE MANUALSA. Furnish number of copies as required by Section 01785, including system operating description,as-built drawings, catalog cuts, installation instruction, maintenance instructions, andreplacement part list for all control systems and equipment. Provide address and telephonenumber of local source for parts and maintenance.3.5 R<strong>EC</strong>ORD DRAWINGSA. Maintain a complete set of Record Electrical Drawings at the site with all changes, etc. markedneatly thereon in a contrasting color. This set shall not be used for any other purpose. Keep theDrawings current at all times and present them to the Contracting Officer upon completion of thework. Record electrical drawings should provide the following information:1. Correct plan location of equipment installed.2. One-line diagram and panel board corrections.3. Detail wiring diagram of all electrical equipment installed. Diagrams shall show the sizeand color of the wire, wire number, and terminal block number.4. The manufacturer’s catalog number or part numbers shall be included for all equipmentinstalled.B. This information shall be incorporated in a neatly drafted and legible format as part of theoperating and maintenance manuals.END OF S<strong>EC</strong>TION16420-205/08 CONTROL SYSTEM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!