12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

G. Linkage: Delrin.H. Lever Pins, Retaining Rings, Screws: Stainless steel.I. Pressure Rating: 300 psi.J. Products manufactured by APCO, Crispin, GA Industries, or others, and which meet theseSpecifications.PART 3 - EX<strong>EC</strong>UTION3.01 EXAMINATIONA. Prior to installation, inspect interconnecting piping and end connections to assure compatibility.B. Prior to installation, inspect and verify condition of valve and appurtenances. Installation constitutesinstaller's acceptance of product condition for satisfactory installation.C. Assure exposed piping is sufficiently supported to bear weight of valve when it is installed.3.02 PREPARATIONA. Correct defects or conditions which may interfere with or prevent a satisfactory installation.3.03 ER<strong>EC</strong>TION/INSTALLATION/APPLICATIONA. See Section 150603.04 FIELD QUALITY CONTROLA. Repair or remove and replace defective valves.3.05 ADJUSTINGA. Make final adjustments on Air-Release Valves prior to acceptance by Owner.END OF S<strong>EC</strong>TION15114 - 211/07 SP<strong>EC</strong>IAL VALVES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!