12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 15075M<strong>EC</strong>HANICAL IDENTIFICATIONPART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of furnishing and installing markers, tags, and labels formechanical piping, ducts, and equipment.1 .2 SUBMITTALSA. As specified in Section 01330.B. Complete list of proposed materials, including manufacturers' names, catalog numbers, anddescriptive literature for the following:1. Plastic pipe markers.2. Tags.3. Labels and nameplates.4. Stencils.5. Paint.1 .3 CLOSEOUT SUBMITTALSA. As specified in Section 01770.B. Furnish valve schedule for each piping system, typewritten on 8-1/2-inch x 11-inch bond paper.In tabular format, include valve identification number, piping system, system abbreviation (asshown on tag), location of valve (room or space), function, normal position, and area served.Mark valves which are intended for emergency shut-off and similar special uses by special flags inmargin of schedule. Show valve tag designations on as-built drawings.C. Furnish project record drawings with valve locations and tag designations shown on floor andelevation plans and schematic diagrams.PART 2 PRODUCTS2 .1 PLASTIC PIPE MARKERSA. Pre-formed, semi-rigid, pre-printed, snap-on, color-coded pipe markers that completely encirclethe pipe and are protected by corrosive resistant plastic coating. Directional flow arrows shall beintegral with the marker. Snap-on Markers by Seton Name Plate Company, Branford,Connecticut, or approved equal.2 .2 TAGS15075-1M<strong>EC</strong>HANICAL IDENTIFICATION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!