PART 3 EX<strong>EC</strong>UTION3 .1 MARKING TAPEA. Install tape in backfill directly over each buried utility line at the depth shown on the drawings.Place tape by plowing or during final backfilling.B. Where utilities are buried in a common trench, identify each line by a separate warning tape. Burytapes side by side directly over the applicable line.3 .2 LOCATOR WIREA. Place locator wire on top of the utility and secure with tape at 5-foot intervals. Wire shall becontinuous strand. Bring locator wire to surface as shown on the drawings or at maximum 300-foot intervals and install in locator wire box. Loop 2-feet of extra wire and install inside of thelocator wire box. Do not cut the wire at the locator wire box installations.B. In paved areas, install locator wire box 3 feet off edge of pavement.END OF S<strong>EC</strong>TION02502-211/07 UTILITY LINE MARKING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!