12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C. When temporary connections are removed, restore existing utility services to their originalcondition.3 .2 HEATING, VENTILATING, AND COOLINGA. Provide and maintain adequate approved facilities, as required for safety and constructionrequirements, during the progress of the work. Provide ample clearance around stoves and heatersand all chimney and vent connections to prevent ignition of combustible material.B. Furnish temporary heating and cooling. Use of permanent heating and cooling system will not beallowed without written authorization from Contracting Officer. When the permanent heating andcooling system is approved for use as temporary heating and cooling, pay all costs until finalacceptance. Permanent heating and cooling system must be sufficiently complete, includingcontrols, to permit safe operation.C. Install and maintain temporary filters when air handing equipment is used for temporary heatingand cooling. Install new filters before final acceptance in addition to any extra sets of filtersrequired. Clean coils as determined by Contracting Officer.D. Equipment warranties for equipment used for temporary heating and cooling shall start on date ofFinal Acceptance.3 .3 TELEPHONEA. No telephone service is available on site for Contractor's use. Make arrangements with telephonecompany and pay all costs. See Section 01520 for telephone for Contracting Officer's use.3 .4 WATERA. Arrange with park for potable water and pay all costs.B. Furnish cool, potable water for construction personnel in locations convenient to work stations.3 .5 SANITARY FACILITIESA. Place in approved locations secluded from public observation and convenient to work stations.Relocate as work progress requires.B. Maintain and clean toilet facilities at least weekly.C. Completely remove sanitary facilities on completion of work.3 .6 FIRE PREVENTION AND PROT<strong>EC</strong>TIONA. Responsible Person: A capable and qualified person shall be placed in charge of fire protection.The responsibilities shall include locating and maintaining fire protective equipment andestablishing and maintaining safe torch cutting and welding procedures.B. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not storeflammable or combustible liquids within park boundaries without prior approval of ContractingOfficer. Provide adequate ventilation during use of volatile or noxious substances.C. Spark Arresters:01510-211/07 TEMPORARY SERVICES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!