12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 16210EL<strong>EC</strong>TRIC SERVICEPART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of furnishing and installing service entrance equipment,raceways, and conductors.1 .2 RELATED WORKA. Basic materials and methods - Section 16050B. Underground secondary - Section 16401.1 .3 QUALITY ASSURANCEA. Requirements of the power company.1 .4 COORDINATIONA. The power company, Southern California Edison, is supplying permanent electric power of thephasing, voltage, and characteristics shown. Permanent electric power exists at existing panelMP.B. Coordinate the work of this section with the Contracting Officer.PART 2 PRODUCTS2 .1 SERVICE RACEWAYA. Underground Beyond Well House Limits: Section 16050.B. Aboveground Within Well House: Section 16050.2 .2 SERVICE CONDUCTORSA. Stranded, with 600-volt insulation.B. All conductors shall be copper, THWN; aluminum is not acceptable.1. All terminations and connections shall be suitable for service entrance equipment.2 .3 SERVICE DISCONN<strong>EC</strong>TA. UL listed as "Service Entrance Equipment", externally operable with open or closed positionplainly marked, pad-lockable and capable of interrupting the maximum symmetrical short circuitcurrent available. Provide pressure connectors for attaching service conductors. See Section16050 for panel boards, switches, and individually enclosed circuit breakers.16210-105/08 EL<strong>EC</strong>TRIC SERVICE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!