12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S<strong>EC</strong>TION 01350ARCHEOLOGICAL PROT<strong>EC</strong>TIONPART 1 <strong>GENERAL</strong>PART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of protecting archeological resources contained in soil deposits.1 .2 DEFINITIONSA. Resources: Prehistoric, historic, and recent 20th century artifacts, including charcoal, humanbones, ash, fire rocks, and building materials that indicate the presence of past human occupation.B. Archeologically Sensitive Areas: Areas that have been determined to contain significant in-thegroundarcheological resources.C. Nonsensitive Areas: Areas that have a low likelihood of containing significant in-the-groundarcheological resources.D. Archeological Monitor: Representative of the Government designated to record and collectcultural resources for compliance with Government regulations to protect in-the-groundresources.1 .3 SUBMITTALSA. As specified in Section 01330B. 30 days before start of ground-disturbing site work, submit a Daily Work Schedule, detailingconstruction work in archeologically sensitive areas. Key schedule to drawings and include thefollowing information.1. Starting and ending dates of ground-disturbing construction.2. Locations of temporary facilities, such as barriers, field offices, staging areas, sanitaryfacilities, borrow pits, and haul and access roads.3. Types of construction, such as clearing, topsoil stripping, structure or trench excavation,landscaping, and post construction clean-up.4. Methods and equipment used for each type of construction.5. Plan for relocating work in the event of temporary work stoppages at eacharcheologically sensitive area.1 .4 QUALITY ASSURANCEA. At least one week before on-site work begins, Contractor shall meet with Contracting Officer andArcheological Monitor to discuss Daily Work Schedule and equipment and special methods to be01350-102/08 ARCHEOLOGICAL PROT<strong>EC</strong>TION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!