12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 16131EL<strong>EC</strong>TRICAL PULLBOXESPART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of furnishing and installing underground electrical pullboxes atthe locations shown.1 .2 QUALITY ASSURANCEA. Meet AASHTO requirements for H20 wheel loading.PART 2 PRODUCTS2 .1 PULLBOXES AND MANHOLESA. Provide base and extensions as required to extend depth to allow level entry of conduit. Colorshall be natural concrete color.B. Pullboxes: Precast polymer concrete. Quazite, manufactured by Strongwell, Lenoir City,Tennessee 37771, or approved equal. Dimensions shall be as shown on the drawings.2 .2 COVERSA. Covers shall include pull slots. Covers shall be cast with identification logos as shown on thedrawings.B. Pullbox Covers: Nonskid surface design made of precast polymer concrete, with recessedstainless steel fasteners.2 .3 GROUTA. One part portland cement, one part hydrated lime, and six parts sand.PART 3 EX<strong>EC</strong>UTION3 .1 CONTRACTOR'S OPTIONA. The number of pullboxes shown is a minimum number. The Contractor may install additionalpullboxes, for ease of installing cables, at no additional expense to the Government.3 .2 EXCAVATION AND BACKFILLA. Section 02320.3 .3 INSTALLATION16131-1EL<strong>EC</strong>TRICAL PULLBOXES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!