12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A. Remove demolition debris daily or establish an alternative demolition debris removal schedulewith the Contracting Officer.B. Transport demolition debris to disposal area outside the Park.3.06 SALVAGEA. Contractor shall work with the Contracting Officer and National Monument personnel todevelop a comprehensive salvage schedule prior to the commencement of construction activity.The salvage schedule shall remain open to modification throughout the demolition phase of theproject.B. Carefully remove items to be salvaged and delivered to Contracting Officer’s storage1. Store and protect items indicated to be salvaged2. Replace any items damaged through carelessness in removal, storage, or handling withnew items of same type3. Do not reuse materials or equipment not specifically indicated or specified to be reusedC. Preparation of Equipment for Storage1. Identify each component with markings or tags to show its position in the assembly andthe assembly of which it belongs.2. Place small parts in wooden boxes and clearly mark contents on the outside3. Thoroughly clean and dry equipment.4. Coat unpainted surfaces with 2 coats of rust-preventive compound.5. Attach unit to suitable crate bottom.6. Enclose unit in polyethylene film and seal all seams and the film to the base of the unitwith tape.7. Construct crate of wooden slats around top and sides of unit.8. Attach permanent instruction tag to outside of crate stating "This unit has been preparedfor storage".3.07 EARTHWORKA. Backfill and Compaction1. Surface and subgrade areas voided during demolition shall be backfilled and compactedto 95% of ASTM D698.2. The pit well shall be backfilled and dewatered as necessary to achieve the specifiedcompaction. Fill materials shall comply with the California Well Standards –Requirements for Destroying Wells.3. Backfill material shall be cohesive or granular material free from roots, organic matter,trash, frozen material, and stones having maximum dimensions greater than 6-inches.4. Imported backfill material must be approved by the Contracting Officer.END OF S<strong>EC</strong>TION02072-405/08 DEMOLITION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!