12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 02855BOLLARDSPART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of furnishing and installing metal bollards.PART 2 PRODUCTS2 .1 POSTSA. Bollard posts shall be 6-inch diameter Schedule 40 galvanized steel pipe, with length as shown onthe drawings.2 .2 CONCRETEA. Section 03300.2 .3 PAINTA. Section 09901.B. Paint Color: Finish paint color shall be Safety Yellow. Contracting Officer shall select andapprove finish paint color.2 .4 REFL<strong>EC</strong>TORSA. Reflectorized metal band, 2 inches wide and long enough to cover 115 degrees of thecircumference of the post. Scotchlite, manufactured by 3M company, St. Paul, Minnesota, orapproved equal.PART 3 EX<strong>EC</strong>UTION3 .1 INSTALLATIONA. Excavate post holes to size and depth as shown on the drawings. Place posts as shown. Alignposts so that variation from vertical plane does not exceed 1/2 inch in 42 inches. Maintain postsin a plumb position while backfilling holes with concrete. Finish off top of concrete footing withpositive drainage slope as shown.B. Fill post with concrete and round off top cap as shown. Remove excess concrete from aroundpost.3 .2 PAINTINGA. Clean galvanized steel surfaces free of dirt, concrete, oil, and other surface contaminants. Paint allexposed metal parts of posts in accordance with Section 09901. Apply one coat of primer and twocoats of finish paint.02855-1BOLLARDS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!