DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. After required contact period, dechlorinate and flush system to remove all heavily chlorinatedwater. As allowed by local authority, drain dechlorinated flushing water to sanitary sewer.6. After final flushing and before placing water in service, obtain an independent laboratoryacceptable to the Contracting Officer, to collect samples and test for bacteriological quality.Repeat entire disinfection procedures until satisfactory results are obtained.7. Secure and deliver to Contracting Officer, satisfactory bacteriological reports on samplestaken from system. Insure sampling and testing procedures are in full compliance to AWWAC651, local water purveyor and applicable requirements of State of California.END OF S<strong>EC</strong>TION15060 - 904/08 PIPING AND PIPE FITTINGS: <strong>GENERAL</strong> STATEMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!