12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 16420CONTROL SYSTEMPART 1 – <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of relocating and installing an ultrasonic tank level transmitterfrom 5,000 gallon poly tank to the new steel tank.1 .2 SUBMITTALSA. As specified in Section 01330.B. Shop drawing showing layout of equipment.C. Schematic (elementary or ladder) diagram and wiring (connection) diagram for the tank level andremote indicator. See Section 16050.1 .3 QUALITY ASSURANCEA. Section 16010. Control circuits shall meet the requirements of N<strong>EC</strong> 430 and 725, and NEMAICS-1970.1 .4 COORDINATIONA. Components for like equipment shall be of the same manufacturer where possible.1 .5 CLOSEOUT SUBMITTALSA. As specified in Section 01770.B. Operation and maintenance data for review and approval as required by Section 01785.1. Manufacturer’s operation and maintenance data for all controls.2. Complete list of materials for all control components.3. Vendor furnished as-built drawings of all control circuits.PART 2 – PRODUCTS2.1 NOT USEDPART 3 - EX<strong>EC</strong>UTION3.1 CONTROL DEVICESA. Install in accordance with manufacturer's instructions.16420-105/08 CONTROL SYSTEM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!