12.07.2015 Views

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Advanced <strong>HVAC</strong> <strong>Control</strong>, Information Technology and Open Systemssurround<strong>in</strong>g corridor to block <strong>the</strong> leakage of contam<strong>in</strong>ated air. The cleanroom is made up of work areas which are considered as zones. Theremay be several hundred zones <strong>in</strong> a plant.Zone <strong>Control</strong>Air is supplied to <strong>the</strong> zones through filters located <strong>in</strong> <strong>the</strong> ceil<strong>in</strong>g.The flow and temperature of <strong>the</strong> air are both controlled. The exhaust airis evacuated <strong>in</strong> <strong>the</strong> lower area of <strong>the</strong> zone. In semiconductor manufactur<strong>in</strong>g,each workstation has its own air supply filter and exhaust outlet.In order to conta<strong>in</strong> any toxic fumes, clean air enters <strong>the</strong> workstationat a velocity of about 75-fpm (0.38 m/s). The air that is not pulled<strong>in</strong> by <strong>the</strong> exhaust system is recirculated back <strong>in</strong>to <strong>the</strong> workstation witha fan. The rest of <strong>the</strong> air is returned by a return air header. A damper <strong>in</strong>this header is modulated to control <strong>the</strong> air pressure.Pressure <strong>Control</strong>The pressure <strong>in</strong> <strong>the</strong> isolat<strong>in</strong>g corridor acts as <strong>the</strong> reference for <strong>the</strong>area pressure controller. This controller ma<strong>in</strong>ta<strong>in</strong>s a few hundredths ofan <strong>in</strong>ch of positive pressure relative to <strong>the</strong> isolat<strong>in</strong>g corridor.The quality of <strong>the</strong> build<strong>in</strong>g construction determ<strong>in</strong>es how high thissetpo<strong>in</strong>t will be. Even with lower quality build<strong>in</strong>gs where leakage mayFigure 4-1. Clean room area with workstations and isolat<strong>in</strong>g corridor.©2001 by The Fairmont Press, Inc. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!