12.07.2015 Views

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>HVAC</strong> <strong>Control</strong> <strong>in</strong> <strong>the</strong> <strong>New</strong> <strong>Millennium</strong>tempt to remedy <strong>the</strong>ir situations with piecemeal light<strong>in</strong>g solutions. Retrofitt<strong>in</strong>gprovides an average energy sav<strong>in</strong>gs of 50 cents for each squarefoot of build<strong>in</strong>g space. The average payback is 2-1/2 years. Partner<strong>in</strong>gwith energy service companies can also help with energy audits andfund<strong>in</strong>g light<strong>in</strong>g upgrades.Demand Side Limit<strong>in</strong>gMost utility programs for energy conservation <strong>in</strong> recent years <strong>in</strong>volvedemand-side management (DSM). These programs impact howcustomers use electricity. The concept has two parts. The first tactic is toeven out <strong>the</strong> demand for electricity so that exist<strong>in</strong>g power stations areoperat<strong>in</strong>g at efficient capacities throughout any 24-hour day ra<strong>the</strong>r thanrocket<strong>in</strong>g up dur<strong>in</strong>g bus<strong>in</strong>ess hours and dropp<strong>in</strong>g down dur<strong>in</strong>g <strong>the</strong>night. The o<strong>the</strong>r part of DSM is to deter <strong>the</strong> need for new electricitycapacities.DSM refers to energy and load-shape modify<strong>in</strong>g activities that areimplemented <strong>in</strong> response to utility-adm<strong>in</strong>istered programs. It does notrefer to energy and load-shape changes aris<strong>in</strong>g from normal actions of<strong>the</strong> marketplace or from government-mandated energy-efficiency standards.Dur<strong>in</strong>g <strong>the</strong> late 1980s, utilities began offer<strong>in</strong>g commercial rebateprograms for DSM. Some utilities pay 30 to 50% of <strong>the</strong> <strong>in</strong>stalled cost,while o<strong>the</strong>rs base <strong>the</strong>ir rebate programs on <strong>the</strong> peak-kilowatt-demandsav<strong>in</strong>gs achieved by new equipment. DSM programs consist of plann<strong>in</strong>gand monitor<strong>in</strong>g activities which are designed to encourage consumers tomodify <strong>the</strong>ir level and pattern of electricity usage.In <strong>the</strong> past, <strong>the</strong> primary object of most DSM programs was to promotecost-effective energy usage to help defer <strong>the</strong> need for new sourcesof power, <strong>in</strong>clud<strong>in</strong>g generat<strong>in</strong>g facilities, power purchases, and transmissionand distribution capacity additions. Due to <strong>the</strong> changes that areoccurr<strong>in</strong>g with<strong>in</strong> <strong>the</strong> <strong>in</strong>dustry, electric utilities are also us<strong>in</strong>g DSM as away to enhance customer service.DSM <strong>in</strong>volves peak clipp<strong>in</strong>g, strategic conservation, valley fill<strong>in</strong>g,load shift<strong>in</strong>g, strategic load growth and flexible load shap<strong>in</strong>g. It may<strong>in</strong>clude <strong>in</strong>terruptible services or curtailment of services for specifiedtime periods for commercial customers. Peak clipp<strong>in</strong>g refers to reduc<strong>in</strong>g<strong>the</strong> customer demand dur<strong>in</strong>g peak electricity use periods. This is done©2001 by The Fairmont Press, Inc. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!