12.07.2015 Views

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

HVAC Control in the New Millennium.pdf - HVAC.Amickracing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>HVAC</strong> <strong>Control</strong> <strong>in</strong> <strong>the</strong> <strong>New</strong> <strong>Millennium</strong>classes means that <strong>the</strong> goals of <strong>the</strong> project become important <strong>in</strong> writ<strong>in</strong>gBACnet specifications. There is an effort to make BACnet easier tospecify and to simplify <strong>the</strong> BACnet specification process. The committeecharged with <strong>the</strong> ma<strong>in</strong>tenance of <strong>the</strong> BACnet standard (ASHRAE SSPC-135) has been redef<strong>in</strong><strong>in</strong>g how to specify BACnet.The BACnet standard has detailed <strong>in</strong>formation on how to implement<strong>the</strong> protocol. Clause 22 is devoted to <strong>the</strong> specification of BACnetsystems. It <strong>in</strong>volves <strong>the</strong> concepts of BACnet Conformance Classes andFunctional Groups. The Conformance Classes range from 1 to 6. Thestandard states that <strong>the</strong>y are not hierarchical and that Class 1 is notbetter than Class 6.Product Implementation Conformance Statements (PICS) fromvendors determ<strong>in</strong>e which products can be used toge<strong>the</strong>r. BACnet<strong>in</strong>teroperable systems should be able to provide s<strong>in</strong>gle-seat operationwhere a central PC operates build<strong>in</strong>gs with control systems furnished byseveral suppliers. It should allow equipment <strong>in</strong>tegration <strong>in</strong>clud<strong>in</strong>g chillers,rooftop units, fire alarm, and light<strong>in</strong>g control systems.There will be an expanded availability of <strong>in</strong>telligent devices thatare supplied with <strong>in</strong>telligent electronic panels or <strong>in</strong>terfaces that communicatewith <strong>the</strong> host. These will <strong>in</strong>tegrate light<strong>in</strong>g, security, access, andfire alarm controls <strong>in</strong>to one system, so <strong>the</strong> build<strong>in</strong>g can be run from as<strong>in</strong>gle operator <strong>in</strong>terface.BACnet is not a plug-and-play system nor are <strong>the</strong> o<strong>the</strong>r<strong>in</strong>teroperable options available today. It is not possible to remove a VAVbox controller and replace it with one from ano<strong>the</strong>r supplier withoutperform<strong>in</strong>g additional setup and programm<strong>in</strong>g. These functions willcont<strong>in</strong>ue to be achieved <strong>in</strong> a unique manner by each supplier.Interoperable systems allow <strong>the</strong> follow<strong>in</strong>g tasks to be accomplished<strong>in</strong> a common format:• view<strong>in</strong>g data on a PC (menus, graphics, reports),• chang<strong>in</strong>g setpo<strong>in</strong>ts,• shar<strong>in</strong>g data between controllers,• view<strong>in</strong>g alarms for po<strong>in</strong>ts that are out of a def<strong>in</strong>ed range,• sett<strong>in</strong>g up and modify<strong>in</strong>g schedules, and• sampl<strong>in</strong>g data at regular <strong>in</strong>tervals and retriev<strong>in</strong>g it for view<strong>in</strong>g orstorage.The first three functions will be able to be supported by even <strong>the</strong>©2001 by The Fairmont Press, Inc. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!