10.12.2012 Views

Municipal Code, Complete - City of Santa Barbara

Municipal Code, Complete - City of Santa Barbara

Municipal Code, Complete - City of Santa Barbara

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Calculation Inputs. When using the CECPV Calculator to calculate a photovoltaic credit, the permit<br />

applicant shall input “Site-Specific Detailed Input” including ro<strong>of</strong> pitch (or tilt), the azimuth and the site shading<br />

conditions.<br />

3. Documentation. In order to receive a photovoltaic credit, an applicant for a building permit must<br />

include a copy <strong>of</strong> the CF-1R-PV form generated by the CECPV Calculator on the plans submitted for a building<br />

permit. (Ord. 5446, 2008.)<br />

22.82.080 Expiration.<br />

This Chapter 22.82 shall expire upon the date that the state’s 2008 Building Energy Efficiency Standards take<br />

effect. (Ord. 5446, 2008.)<br />

436-4 rev. 6/30/12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!