21.12.2012 Views

WellCAD Basics - Advanced Logic Technology

WellCAD Basics - Advanced Logic Technology

WellCAD Basics - Advanced Logic Technology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.5.12.2 Easting, Northing and TVD<br />

BOOK 1 - WELLCAD BASICS - 149<br />

Using borehole azimuth and tilt data as input (Well or Mud Logs) one can compute<br />

coordinates for the north and east direction of the borehole path as well as the true<br />

vertical depth (TVD). The outputs of this process are Well or Mud Logs containing<br />

the computed data values.<br />

The computed data can be visualized in typical well deviation diagrams using the<br />

Deviation Module for <strong>WellCAD</strong>.<br />

Typical display of output channels in Deviation Module for <strong>WellCAD</strong><br />

Select the Northing, Easting And TVD process from the Process > Common ><br />

Borehole Deviation. The following dialog box will open:<br />

Easting, Northing, TVD calculation options

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!