21.12.2012 Views

WellCAD Basics - Advanced Logic Technology

WellCAD Basics - Advanced Logic Technology

WellCAD Basics - Advanced Logic Technology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BOOK 1 - WELLCAD BASICS - 75<br />

measured depth the time in seconds since beginning of the drilling is stored in the<br />

Depth Log. The Time Zero would be set to date and time corresponding to the<br />

beginning of the drilling in order to read real dates and times from the displayed axis<br />

(see 1.7.3 Using Time Based Data).<br />

<strong>Advanced</strong>:<br />

The <strong>Advanced</strong> Depth Settings dialog box provides further settings to control the<br />

appearance of major / minor horizontal and vertical grid lines.<br />

<strong>Advanced</strong> Settings dialog box<br />

Items Count:<br />

For each Horizontal Grid Spacing set, the user can define the number of<br />

indicators (depth strings), major grid lines and minor grid lines to be displayed.<br />

Usually one indicator and one major line is displayed per spacing.<br />

2 major and 4 minor subdivisions (left) and 1 major and 8 subdivisions (right)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!