06.01.2013 Views

pdf (22.8 MB) - METRO Group

pdf (22.8 MB) - METRO Group

pdf (22.8 MB) - METRO Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>METRO</strong> GROUP : ANNUAL REPORT 2011 : BUSINESS<br />

→ GROUP MANAGEMENT REPORT : 7. SUSTAiNAbiliTy MANAGEMENT<br />

Areas of activity: energy and resource management<br />

Theme goals status goals Measures<br />

Climate protection/<br />

resource management<br />

Improvement of data quality by upgrading<br />

primary data coverage and increasing<br />

the quality of primary data for targeted<br />

management and increased planning<br />

security by the end of 2013.<br />

Greenhouse gas emissions are to fall by<br />

15 percent from 355 kg/sqm (figure<br />

adjusted) in 2006 to 302 kg/sqm in 2015.<br />

energy consumption per sqm of selling<br />

space is to fall by 3 percent from 414 kWh<br />

in 2009 to 402 kWh in 2011.<br />

MeTRo GRoUp continues to improve its<br />

energy management.<br />

Complete installation of the MeTRo GRoUp<br />

energy management system (>95 percent)<br />

in 2012.<br />

Beginning in 2012, review of every new store<br />

opening regarding the possibility of using a<br />

photovoltaic system.<br />

→ Introduction of a new collection and<br />

calculation system with a shortening of<br />

reporting times in 2011 and 2012.<br />

→ Implementation of the “low hanging<br />

fruit” programme in 2011–2014.<br />

→ energy efficiency steps were introduced<br />

as part of the “low hanging fruit”<br />

programme 2011–2014. The goal of<br />

402 kWh per sqm of selling space was<br />

not reached in 2011. The reasons for<br />

this include changes in data collection.<br />

→ expansion of collection and monitoring<br />

of energy consumption with the help of<br />

smart metering systems. at the end of<br />

2011, 80 percent of all stores around<br />

the world were equipped with such<br />

systems.<br />

→ expanding the qualifications and<br />

responsibilities of employees, e.g. by<br />

regular training of in-house technicians<br />

and annual energy checks.<br />

→ Development of uniform standards for<br />

new and remodelled sites.<br />

→ Roll-out of successful efficiency<br />

measures.<br />

→ Implementation of the “low hanging<br />

fruit” programme in 2011–2014.<br />

→ Development of a project plan including<br />

work instructions.<br />

Revision of energy primer in 2012. → Development of a project plan.<br />

→ p. 134<br />

status<br />

measures

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!