pdf (22.8 MB) - METRO Group
pdf (22.8 MB) - METRO Group
pdf (22.8 MB) - METRO Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>METRO</strong> GROUP : ANNUAL REPORT 2011 : BUSINESS<br />
→ GROUP MANAGEMENT REPORT : 7. SUSTAiNAbiliTy MANAGEMENT<br />
Areas of activity: energy and resource management<br />
Theme goals status goals Measures<br />
Climate protection/<br />
resource management<br />
Improvement of data quality by upgrading<br />
primary data coverage and increasing<br />
the quality of primary data for targeted<br />
management and increased planning<br />
security by the end of 2013.<br />
Greenhouse gas emissions are to fall by<br />
15 percent from 355 kg/sqm (figure<br />
adjusted) in 2006 to 302 kg/sqm in 2015.<br />
energy consumption per sqm of selling<br />
space is to fall by 3 percent from 414 kWh<br />
in 2009 to 402 kWh in 2011.<br />
MeTRo GRoUp continues to improve its<br />
energy management.<br />
Complete installation of the MeTRo GRoUp<br />
energy management system (>95 percent)<br />
in 2012.<br />
Beginning in 2012, review of every new store<br />
opening regarding the possibility of using a<br />
photovoltaic system.<br />
→ Introduction of a new collection and<br />
calculation system with a shortening of<br />
reporting times in 2011 and 2012.<br />
→ Implementation of the “low hanging<br />
fruit” programme in 2011–2014.<br />
→ energy efficiency steps were introduced<br />
as part of the “low hanging fruit”<br />
programme 2011–2014. The goal of<br />
402 kWh per sqm of selling space was<br />
not reached in 2011. The reasons for<br />
this include changes in data collection.<br />
→ expansion of collection and monitoring<br />
of energy consumption with the help of<br />
smart metering systems. at the end of<br />
2011, 80 percent of all stores around<br />
the world were equipped with such<br />
systems.<br />
→ expanding the qualifications and<br />
responsibilities of employees, e.g. by<br />
regular training of in-house technicians<br />
and annual energy checks.<br />
→ Development of uniform standards for<br />
new and remodelled sites.<br />
→ Roll-out of successful efficiency<br />
measures.<br />
→ Implementation of the “low hanging<br />
fruit” programme in 2011–2014.<br />
→ Development of a project plan including<br />
work instructions.<br />
Revision of energy primer in 2012. → Development of a project plan.<br />
→ p. 134<br />
status<br />
measures