22.03.2013 Views

Vision and Voyages for Planetary Science in the - Solar System ...

Vision and Voyages for Planetary Science in the - Solar System ...

Vision and Voyages for Planetary Science in the - Solar System ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE 9.1 Key F<strong>in</strong>d<strong>in</strong>gs <strong>and</strong> Recommendations from Chapters 4-8.<br />

Flagship<br />

Missions<br />

New Frontiers<br />

Missions<br />

Discovery<br />

Missions<br />

International<br />

Cooperation<br />

Chapter 4<br />

The Primitive<br />

Bodies<br />

Not proposed. Use<br />

limited resources<br />

to <strong>in</strong>itiate<br />

technology<br />

program to assure<br />

that Cryogenic<br />

Comet Sample<br />

Return can be<br />

carried out <strong>in</strong> <strong>the</strong><br />

2020s.<br />

Raise <strong>the</strong> cost cap.<br />

Goals <strong>in</strong> priority<br />

order:<br />

1. Comet Surface<br />

Sample Return<br />

2. Trojan Tour <strong>and</strong><br />

Rendezvous<br />

Ensure an<br />

appropriate<br />

cadence of future<br />

Discovery<br />

missions.<br />

Chapter 5<br />

The Inner Planets<br />

Top <strong>and</strong> only<br />

priority is <strong>the</strong><br />

Venus Climate<br />

Mission.<br />

Regular cadence is<br />

highly desirable.<br />

Goals <strong>in</strong> priority<br />

order:<br />

1. Venus In Situ<br />

Explorer<br />

2. South Pole-<br />

Aitken Bas<strong>in</strong><br />

Sample Return<br />

3. Lunar<br />

Geophysical<br />

Network<br />

Ensure a regular<br />

cadence of future<br />

Discovery<br />

missions.<br />

Cont<strong>in</strong>ue support<br />

via participat<strong>in</strong>g<br />

scientist programs<br />

<strong>and</strong> Missions of<br />

Opportunity.<br />

Chapter 6<br />

Mars<br />

Initiate <strong>the</strong> Mars<br />

Sample Return<br />

campaign.<br />

First <strong>and</strong> highest<br />

priority element is<br />

Mars Astrobiology<br />

Explorer-Cacher<br />

(MAX-C)<br />

Nei<strong>the</strong>r Mars<br />

Geophysical<br />

Network nor Mars<br />

Polar Climate<br />

missions are<br />

recommended at<br />

this time.<br />

Small spacecraft<br />

missions can make<br />

important<br />

contributions to <strong>the</strong><br />

study of Mars.<br />

MSR could<br />

proceed as NASAonly<br />

program, but<br />

<strong>in</strong>ternational<br />

collaboration is<br />

needed to make<br />

real progress.<br />

Trace Gas Orbiter<br />

is an appropriate<br />

start.<br />

Chapter 7<br />

The Giant Planets<br />

Top <strong>and</strong> only priority<br />

<strong>for</strong> a new flagship<br />

mission is <strong>the</strong> Uranus<br />

Orbiter <strong>and</strong> Probe.<br />

Europa Jupiter<br />

<strong>System</strong> Mission<br />

should:<br />

⎯Ma<strong>in</strong>ta<strong>in</strong> Jupiter<br />

system science as<br />

high priority<br />

⎯Designate Jupiter<br />

system science as<br />

top-ranked priority<br />

dur<strong>in</strong>g approach <strong>and</strong><br />

early tour phases<br />

⎯Incorporate Jupiter<br />

system science<br />

specific needs <strong>in</strong>to<br />

jovian tour design<br />

Current cost cap is<br />

<strong>in</strong>sufficient to permit<br />

many of <strong>the</strong> highest<br />

<strong>in</strong>terest missions.<br />

Only possible current<br />

mission is Saturn<br />

Probe.<br />

Allow proposals <strong>for</strong><br />

targeted <strong>and</strong> facilityclass<br />

orbital space<br />

telescopes <strong>in</strong><br />

Discovery program.<br />

Chapter 8<br />

Satellites<br />

Cont<strong>in</strong>ue Cass<strong>in</strong>i<br />

mission.<br />

Highest priority<br />

new mission <strong>in</strong><br />

priority order:<br />

1. Jupiter Europa<br />

Orbiter component<br />

of EJSM.<br />

2. Titan flagship<br />

mission.<br />

3. Enceladus<br />

Orbiter.<br />

Io Observer is<br />

higher priority than<br />

Ganymede Orbiter.<br />

Encourage<br />

cont<strong>in</strong>ued<br />

collaboration<br />

between NASA,<br />

ESA, <strong>and</strong> JAXA to<br />

enable <strong>the</strong><br />

implementation of<br />

all three<br />

components of<br />

EJSM.<br />

PREPUBLICATION COPY—SUBJECT TO FURTHER EDITORIAL CORRECTION<br />

9-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!