27.06.2013 Views

Challenges and Opportunities for Innovation in the Public Works ...

Challenges and Opportunities for Innovation in the Public Works ...

Challenges and Opportunities for Innovation in the Public Works ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Test Water Quality at M<strong>in</strong>imal Cost<br />

Pipe Loop Solves Problem of Multiple Benefits<br />

Difficult <strong>and</strong> Expensive Test<strong>in</strong>g<br />

* Determ<strong>in</strong>es overall effect of water quali-<br />

The potable water supply at every Army ty on distribution systems<br />

<strong>in</strong>stallation is different. Corrosive elements <strong>in</strong><br />

<strong>the</strong> water can cause severe deterioration of @ Operates with m<strong>in</strong>imal supervision<br />

pipes without chemical treatment. The Pipe<br />

Loop System, developed by <strong>the</strong> U.S. Army 9 Allows side-by-side tests with chemicals<br />

Construction Eng<strong>in</strong>eer<strong>in</strong>g Research Laboratory to determ<strong>in</strong>e optimal amount of chemi-<br />

(USACERL), allows water plant personnel to cal additive, <strong>the</strong>reby improv<strong>in</strong>g <strong>the</strong><br />

test <strong>the</strong> amount <strong>and</strong> effects of various water water quality <strong>and</strong> extend<strong>in</strong>g <strong>the</strong> life of<br />

treatments on different pipe materials at specific <strong>the</strong> water distribution system<br />

sites with m<strong>in</strong>imal ef<strong>for</strong>t <strong>and</strong> expense.<br />

e Helps <strong>in</strong>stallations meet evaluation cri-<br />

A Pipe Loop System can be built us<strong>in</strong>g off- teria of environmental regulations:<br />

<strong>the</strong>-shelf materials <strong>and</strong> mounted on a 3-foot x<br />

4-foot board on a wall. The water flow * National Interim Primary Dr<strong>in</strong>k<strong>in</strong>g<br />

through <strong>the</strong> system can be easily controlled <strong>and</strong> Water Regulation (NIPDWR)<br />

quantified. Pipe material samples <strong>in</strong> <strong>the</strong> <strong>for</strong>m<br />

of pipe <strong>in</strong>serts <strong>and</strong> coupons are easily removed * Safe Dr<strong>in</strong>k<strong>in</strong>g Water Act<br />

<strong>and</strong> evaluated.<br />

• Copper <strong>and</strong> Lead Rules of <strong>the</strong> Clean<br />

The design allows distribution system mate- Water Act<br />

rials to be placed <strong>in</strong> direct contact with water<br />

under conditions simulat<strong>in</strong>g typical operation.<br />

It also allows water chemical treatments to be Available Through Exclusive<br />

tested be<strong>for</strong>e actual use. The chemical treat- Ucens<strong>in</strong>g Agreement<br />

ments may be tested <strong>in</strong>dividually or <strong>in</strong> side-byside<br />

comparisons. USACERL Technical Report N-88/12 (1988)<br />

describes <strong>the</strong> development <strong>and</strong> evaluation of <strong>the</strong><br />

Pipe Loop System. Installations can purchase a<br />

Pipe Loop System Widely system through Evans Mach<strong>in</strong>e & Tool Co., 410<br />

Demonstrated Summit Ave., Perth Amboy, NJ, (908) 442-<br />

1144, with whom USACERL has an exclusive<br />

The Pipe Loop System was demonstrated at licens<strong>in</strong>g agreement.<br />

five Army <strong>in</strong>stallations. At Aberdeen Prov<strong>in</strong>g<br />

Ground's Edgewood water treatment plant, <strong>the</strong><br />

Pipe Loop System was used to develop an<br />

optimal water treatment <strong>for</strong> reduc<strong>in</strong>g lead dis- Po<strong>in</strong>ts of Contact<br />

solution. The test<strong>in</strong>g represents a protocol <strong>for</strong><br />

meet<strong>in</strong>g <strong>the</strong> test<strong>in</strong>g requirements proposed by Richard Scholze, U.S. Army Construc-<br />

EPA <strong>in</strong> 1988 <strong>for</strong> evaluat<strong>in</strong>g options that reduce tion Eng<strong>in</strong>eer<strong>in</strong>g Research, Laboratory,<br />

lead <strong>and</strong> copper dissolution from household P.O. Box 4005, Champaign, IL 61824plumb<strong>in</strong>g.<br />

4005, COMM 217-373-6743; or Malcolm<br />

McLeod, U.S. Army Eng<strong>in</strong>eer<strong>in</strong>g <strong>and</strong><br />

The Pipe Loop System at Fort Bragg, NC, Hous<strong>in</strong>g Support Center (USAEHSC),<br />

is sav<strong>in</strong>g <strong>the</strong> <strong>in</strong>stallation money. Not count<strong>in</strong>g Fort Belvoir, VA 22060-5516, COMM<br />

<strong>the</strong> potential ma<strong>in</strong>tenance sav<strong>in</strong>gs, Fort Bragg 703-355-2003<br />

estimates that <strong>the</strong>y have saved approximately<br />

$15,000/year by determ<strong>in</strong><strong>in</strong>g <strong>the</strong> optimal water<br />

treatment us<strong>in</strong>g <strong>the</strong> Pipe Loop System. Without<br />

sacrific<strong>in</strong>g water quality, <strong>the</strong> amount of<br />

chemical additives was reduced, <strong>the</strong>reby lower<strong>in</strong>g<br />

chemical <strong>and</strong> labor costs.<br />

Issued by USAEHSC, Fort Belvoir, VA, LAW 25-30. Additional copies are available from <strong>the</strong><br />

FEAP In<strong>for</strong>mation Center, P.O. Box 4005, Champaign, IL 61824-4005, phone 217-352-6511 x386<br />

224

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!