27.06.2013 Views

Challenges and Opportunities for Innovation in the Public Works ...

Challenges and Opportunities for Innovation in the Public Works ...

Challenges and Opportunities for Innovation in the Public Works ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRR-4 Geotextile Applications PRR-1 1 Pavement Dra<strong>in</strong>age: Open-Graded<br />

PRR-10 Technology Application Process Base<br />

FEAP Fact Sheet Book - - Collection of all FEAP Fact Sheets.<br />

VIDEOTAPES - To borrow a videotape, please check <strong>the</strong> desired size. If you would like a personal copy, please make<br />

one <strong>and</strong> return <strong>the</strong> tape to us. Do not distribute or sell <strong>the</strong> tape to o<strong>the</strong>rs.<br />

(VHS)<br />

V-1 Instructions <strong>for</strong> <strong>the</strong> Use of <strong>the</strong> Army Pa<strong>in</strong>t Test Kit 1/2' 3/4'<br />

V-2 Structural Enhancement of Railroad Tracks - 1/2' -3/4'<br />

V-3 Fuel-Resistant Pavement Sealers - 1/2' -3/4'<br />

V-4 Potholes: Causes, Preventions, <strong>and</strong> Cures - 1/2' 3/4"<br />

V-S Dustproof<strong>in</strong>g - 1/2' 3/4'<br />

V-6 Repair of Concrete Water Storage Tanks - 1/2' -3/4'<br />

V-7 Repair of Concrete Foot<strong>in</strong>gs <strong>and</strong> Structures - 1/2' -3/4'<br />

V-8 Reroof<strong>in</strong>g With Protected Membranes - 1/2' -3/4'<br />

V-9 Annual <strong>and</strong> Long-Range Work Plann<strong>in</strong>g With Micro PAVER - 1/2' -3/4'<br />

V-10 ROOFER - 1/2N -3/4'<br />

V-1I Railroad Inspection (Four Parts: Tie Renewal; Spot Alignment;<br />

Spot Surfac<strong>in</strong>g a Jo<strong>in</strong>t; Turnout Inspection) - 1/2' -3/4'<br />

PRODUCT FLIERS - One-page, full-color 'ads' describ<strong>in</strong>g technologies that have been demonstrated successfully<br />

under FEAP <strong>and</strong> are ready <strong>for</strong> implementation.<br />

PR-1 Dustproof<strong>in</strong>g - BD-3 Protective Membrane Roof<br />

PR-2 Pothole Patch<strong>in</strong>g S BD-5 Fire Protection Management System<br />

PR-3 Railroad Track Inspection (FIRMS)<br />

PR-4 Crack<strong>in</strong>g <strong>and</strong> Seat<strong>in</strong>g - ET-1 Diurnal Ice Storage<br />

PR-5 Asphalt Stabilization of Railroad Track - ET-2 Condens<strong>in</strong>g Heat Exchangers<br />

PR-6 Geotextiles - ET-3 High-Efficiency Boilers<br />

PR-7 Fuel-Resistant Sealers - ET4 Photovoltaic Power Systems<br />

PR-8 Install<strong>in</strong>g Pavement Crack <strong>and</strong> jo<strong>in</strong>t - ET-5 Exterior Insulation <strong>and</strong> F<strong>in</strong>ish Systems<br />

Sealants - EQ-1 Remote Site Latr<strong>in</strong>es<br />

PR-9 Asphalt Rubber <strong>and</strong> Geotextile - EQ-2 Trickl<strong>in</strong>g Filters<br />

Interlayers <strong>for</strong> Pavement Overlays<br />

SCT-1 Ceramic Anodes<br />

-<br />

-<br />

EQ-3<br />

EQ-4<br />

Noise Monitor <strong>and</strong> Warn<strong>in</strong>g System<br />

Pipe Loop System<br />

MG-1 Automation of Self-Help Program - EQ-5 Geographic Resources Analysis<br />

BD-1 Pa<strong>in</strong>t Test Kit Support System (GRASS)<br />

BD-2 EPDM Roof<strong>in</strong>g - EQ-6 Pipe Mole<br />

NAME<br />

TELEPHONE<br />

230

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!