24.10.2013 Views

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Configuring</strong> PROFINET IO Devices<br />

4.2 Steps For <strong>Configuring</strong> a PROFInet IO System<br />

4.2.1 Overview: From Configuration To Cyclical Data Exchange<br />

The following sections describe the basic steps required to place a PROFINET IO<br />

system in operation. It tells you how to configure PROFINET components, assign<br />

addresses <strong>and</strong> how the system starts.<br />

<strong>Configuring</strong> an IO system in HW Config<br />

Assign addresses<br />

Startup<br />

1. Assign parameters to an IO controller (i.e. CPU 317-2 PN/DP) in HW Config.<br />

While assigning the interface parameters, assign an Ethernet subnet <strong>and</strong> an IP<br />

address.<br />

2. Arrange all required IO devices in the IO system ("railroad track").<br />

3. For each IO device: check the device name, <strong>and</strong>, if necessary, change it <strong>and</strong><br />

set its parameters.<br />

1. Each IO device must have the configured device name assigned to it.<br />

2. Download the hardware configuration while the CPU is in STOP mode.<br />

The configured IP address is automatically assigned to the PN interface (e.g. a<br />

CPU) when the hardware configuration is downloaded.<br />

At startup, the CPU transfers the downloaded configuration via the PN interface to<br />

the IO devices. As with PROFIBUS DP, the "'Finished' message by modules" <strong>and</strong><br />

"Transfer of parameters to modules" monitoring times that are assigned as<br />

parameters apply here as well.<br />

At startup, the CPU can identify the IO devices by their device names <strong>and</strong><br />

automatically transfer the associated IP addresses.<br />

After the addresses <strong>and</strong> parameters have been successfully transferred within the<br />

monitoring times, the PROFINET devices start their cyclical data exchange.<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

A5E00706939-01 4-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!