24.10.2013 Views

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Configuring</strong> IRT <strong>Communication</strong><br />

<strong>Configuring</strong> the Receiver<br />

1. Open the property sheet for the IO controller (double-click the corresponding<br />

row in the configuration table in HW Config).<br />

2. Select the "Receiver" tab.<br />

3. Click the "New" button.<br />

4. In the property sheet for the receiver, click the "Assign Sender" button.<br />

5. In the "Assign Sender" dialog box that is displayed, select the data range of the<br />

desired station. This is the data range to be received by the local CPU.<br />

6. Confirm your settings with "OK".<br />

7. In the property sheet for the receiver, enter the start address of the address<br />

area that will be used when receiving.<br />

The length of the address area should not be changed since it will be<br />

automatically adjusted to the length of the sender range.<br />

Note: The configuration can only be compiled if the sender range <strong>and</strong> the<br />

receiver range have the same lengths!<br />

8. Repeat steps 3 to 7 for additional receiver ranges .<br />

9. Each assigned sender has a diagnostic address reserved for it. The receiver<br />

can detect failure of the sender by means of its diagnostic address.<br />

Click the "Diagnostic Addresses" button to edit these addresses<br />

5.8 Downloading an IRT Configuration<br />

The configuration data must be downloaded to all devices that are involved in IRT<br />

communication.<br />

Before downloading, first perform a consistency check <strong>and</strong> eliminate any errors<br />

that may exist.<br />

Recommendation<br />

Sync domains are not limited to one station. Download the IRT configuration from<br />

the network configuration (NetPro).<br />

To do this, select the Ethernet subnet <strong>and</strong> then select the PLC > Download to<br />

Current Project> Stations on the Subnet menu comm<strong>and</strong>.<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

5-8 A5E00706939-01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!