17 Commissioning <strong>and</strong> Service<br />

Preparations for commissioning<br />

For initial commissioning of networked stations you must initially download<br />

configuration data to each one of the PLCs separately via menu comm<strong>and</strong> PLC ><br />

Download (SIMATIC Manager). This supplies the PLCs with their required<br />

hardware configuration as well as their network node address. After that you can<br />

access the network with the menu comm<strong>and</strong> PLC > Compile And Download<br />

Objects.<br />

What has to be done if modifications were made during a commissioning or<br />

service phase<br />

If a multiproject is affected, we recommend that you adjust the projects before you<br />

download them to the PLC (In SIMATIC Manager, call menu comm<strong>and</strong> File ><br />

Multiproject > Adjust projects). After that you can call the central function<br />

"Compile <strong>and</strong> download objects" to download the changes to the PLC.<br />

17.1 Commissioning PROFIBUS Nodes<br />

As of <strong>STEP</strong> 7 V5.2 you can use your PG for online access to PROFIBUS nodes,<br />

even if only DP slaves <strong>and</strong> are connected to the PROFIBUS apart from the PG.<br />

At these nodes you can perform diagnostics, monitor their inputs <strong>and</strong> modify the<br />

outputs. You can also reconfigure the nodes <strong>and</strong> save the currently displayed<br />

configuration as the new configuration (select the menu comm<strong>and</strong> PLC ><br />

PROFIBUS > Save PROFIBUS Online Configuration as).<br />

You can use the configuration saved in this manner as a basis for configuring new<br />

station (in HW Config, select the menu comm<strong>and</strong> Station > Open).<br />

How to start online access<br />

In SIMATIC Manager, start this function with menu comm<strong>and</strong> PLC > PROFIBUS ><br />

Operator Control/Monitoring And Diagnosis Of Nodes, or, when you configure<br />

the hardware for an open offline station, with menu comm<strong>and</strong> PLC > Operator<br />

Control/Monitoring And Diagnosis Of Nodes.<br />

You will be displayed a view similar to that of HW Config (Station > Open Online).<br />

The difference is here that you can specify nodes (e.g. via the context-sensitive<br />

menu Specify Module), modify parameters <strong>and</strong> save the new configuration as<br />

new station.<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

A5E00706939-01 17-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!