24.10.2013 Views

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Downloading<br />

Procedure<br />

• Select the menu comm<strong>and</strong> PLC > Download To Module.<br />

<strong>STEP</strong> 7 guides you by means of dialog boxes to the result.<br />

The configuration for the complete programmable controller is downloaded to the<br />

CPU. The CPU parameters become active immediately. The parameters for the<br />

other modules are transferred to the modules during startup.<br />

Note<br />

Partial configurations, for example, the configuration of individual racks, cannot be<br />

downloaded to a station. For consistency reasons, <strong>STEP</strong> 7 always downloads the<br />

whole configuration to the station.<br />

Changing the CPU Operating Mode During Downloading<br />

When you trigger the function PLC > Download, you can execute the following<br />

actions on the programming device guided by the dialog boxes:<br />

• Switch the CPU to STOP<br />

(if the mode selector is set to RUN-P or the connection to the CPU is authorized<br />

by password)<br />

• Compress the memory<br />

(if not enough continuous free memory is available)<br />

• Switch the CPU back to RUN<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

14-2 A5E00706939-01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!