24.10.2013 Views

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Networking Stations<br />

The connection points in the network view look like this ("PG/PC(1))" <strong>and</strong><br />

("PG/PC(2)"):<br />

You can now assign your PG one of the "PG/PC" symbols (to identify the device<br />

you intend to use for accessing stations online). Assignment updates the interfaces<br />

in the programming device (PG or PC) to match the configured settings. If you<br />

change your configured settings (e.g. by modifying the transmission rate or another<br />

network property), the interface in your PG or PC will be updated automatically.<br />

Procedure<br />

1. If the PG/PC has already been assigned: Reverse the assignment by selecting<br />

the "PG/PC" symbol <strong>and</strong> activating the PLC > Remove PG/PC Assignment<br />

menu comm<strong>and</strong>. The assigned PG/PC symbol differs from the symbol for nonassigned<br />

PGs/PCs.<br />

2. Select a "PG/PC" symbol in the network view to represent the programming<br />

device you have connected.<br />

3. Select the PLC > Assign PG/PC menu comm<strong>and</strong>.<br />

4. Use the "Assignment" tab to assign a set of interface parameters in your<br />

programming device (your PG/PC)to an interface of the "PG/PC" symbol.<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

11-22 A5E00706939-01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!