24.10.2013 Views

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Configuring</strong> <strong>Connections</strong><br />

Case 2: Configuration with non-redundant H-Station (local) <strong>and</strong> redundant H-<br />

Station (remote)<br />

In this case, there is a difference whether the redundant partner station is fitted<br />

with a total of two or four CPs.<br />

If the partner station is fitted with a total of two CPs, then one connection resource<br />

is reserved on the local H-CPU <strong>and</strong> two connection resources are reserved on the<br />

local CP.<br />

If the partner station is fitted with a total of four CPs <strong>and</strong> the "Enable max. CP<br />

redundancy" option was selected, then a total of four connection paths is possible.<br />

Even so, one connection resource is reserved the local H-CPU, <strong>and</strong> two<br />

connection resources are reserved for the local CP. The reason for this is that a<br />

maximum of two partial connections can be active.<br />

(1) Partial connection<br />

(2) Fault-tolerant S7 connection<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

A5E00706939-01 12-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!