24.10.2013 Views

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

Configuring Hardware and Communication Connections STEP 7.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Configuring</strong> <strong>Connections</strong><br />

FMS Interface<br />

<strong>Communication</strong> through the FMS interface takes place only through CPs. Each<br />

FMS connection takes up one resource at the CP for the end point. At the CPU,<br />

each CP requires a connection resource for communication to it.<br />

(1) Available connection resource<br />

(2) Assigned connection resource<br />

(3) PROFIBUS<br />

Note<br />

To execute programming device functions on CPs for the S7-400 through the MPI<br />

or through the integrated DP interface, two connection resources are needed at the<br />

CPU (for two transition points). This requirement must be taken into account in<br />

determining the total number of configured <strong>STEP</strong> 7 connections.<br />

S7 <strong>Connections</strong> through S7/M7-300 <strong>and</strong> C7-600<br />

For S7 connections established via the MPI interface, only one connection<br />

resource for the end point is occupied at the FM for an S7/M7-300 (for CPU 312-<br />

316 only) <strong>and</strong> C7-600.<br />

(1) Available connection resource<br />

(2) Assigned connection resource<br />

<strong>Configuring</strong> <strong>Hardware</strong> <strong>and</strong> <strong>Communication</strong> <strong>Connections</strong> with <strong>STEP</strong> 7<br />

12-10 A5E00706939-01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!