DG RISK DESIGN GUIDANCE<br />
Alternatives Routes<br />
Locate sound systems so that peak zones do not overlap with<br />
other sound systems.<br />
Manage flows around big sound systems with stewarding.<br />
Introduce separation between dancers and pedestrian traffic in the<br />
vicinity of big sound systems.<br />
2.72 The <strong>Carnival</strong> Route Design Guidance was presented to all stakeholders in October 2001 at a<br />
series of working group meetings. Following these meetings, <strong>Carnival</strong> stakeholders decided<br />
on a shortlist of six alternative routes for evaluation: ‘Horseshoe’; ‘Merging Horseshoe’; West-<br />
East ‘EII’; East-West ‘EII’; ‘Reverse Park’; and ‘The Chair’.<br />
The Horseshoe Route: the horseshoe route is similar<br />
to the circular route except for two key differences.<br />
Firstly, it would not pass along the northern section<br />
of existing route, which comprises of Kensal Road<br />
and Elkstone Road. Instead, the route would start at<br />
the Great Western Road/Harrow Road junction and<br />
include the narrow section at the top of Great<br />
Western Road. Secondly, the current direction of the<br />
flow would be reversed so that it would go clockwise<br />
and finish at the top of Ladbroke Grove. The<br />
judging point would remain in the same position as<br />
was for <strong>Carnival</strong> 2001 and previous years.<br />
Merging Horseshoe: the merging horseshoe route<br />
starts in two branches, one from Ladbroke Grove and<br />
the other from Great Western Road. These would<br />
merge at the “Five Ways” junction into a single<br />
route. The route would move down towards the<br />
Bayswater road and be judged somewhere along its<br />
length adjacent to the park (although no clear<br />
location was specified by the Stakeholders). It would<br />
then continue west for dispersal of floats and<br />
carnivalists around <strong>Notting</strong> <strong>Hill</strong> Gate.<br />