Battery Set for UPS 60, Or<strong>de</strong>r No. 77 3450 00<br />

Dimensional drawing:<br />

2. Connection<br />

The connection terminals are provi<strong>de</strong>d as cage srew/plug-in clamps.<br />

1. Release 6 fastening screws for the cover and remove the cover to the front.<br />

Now, the terminal connection clamps are accessible.<br />

2. Direct the connection cable through the cable duct into the power supply unit and connect to the<br />

appropriate terminal posts as <strong>de</strong>signated in the power supply unit.<br />

CAUTION! Check for the correct connection, orientation and screwing.<br />

3. Secure the connection cable against being pulled from the housing for example by fixing the<br />

installation cable with the screwed cable gland.<br />

2.1 Battery test<br />

The power supply unit features an automatic battery load test. The battery load test is an effective<br />

instrument for checking the true battery state. A negative result, i.e. a warning message is issued, may<br />

be caused by one or more of the following:<br />

• Charge status too low.<br />

• Battery fuse has failed.<br />

• Battery not correctly connected.<br />

• Battery is <strong>de</strong>fective.<br />

• Battery is too old, and must be replaced.<br />

English - 2 © <strong>Tunstall</strong> GmbH, Orkotten 66, 48291 Telgte, Germany, www.tunstall.<strong>de</strong>, 00 8802 82, Rev. 2.2 (05/2012)<br />