Flamenco Technical Manual Revision 6.0 - Tunstall.de
Flamenco Technical Manual Revision 6.0 - Tunstall.de
Flamenco Technical Manual Revision 6.0 - Tunstall.de
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5. Installation work sequence<br />
Work step<br />
Description<br />
1. Defining the mounting positions Page 43 and the following.<br />
2. Installation of back boxes Page 49 and the following.<br />
3. Laying the cables Page 51 and the following.<br />
4. Mounting and connecting of <strong>de</strong>vices Refer to chapter “Product<br />
leaflets“, page 83 and the<br />
following.<br />
5. Switching on and checking of power supply Page 61 and the following.<br />
6. Configuring the room terminals (ComTerminal<br />
<strong>Flamenco</strong>, RoomTerminal <strong>Flamenco</strong>, ControlTerminal<br />
<strong>Flamenco</strong>, ControlTerminal with doorplate<br />
<strong>Flamenco</strong>)<br />
7. Configuring OSY-ControlCenter<br />
(SystemOrganizer)<br />
ComTerminal <strong>Flamenco</strong>,<br />
RoomTerminal <strong>Flamenco</strong>:<br />
Refer to chapter “Product<br />
leaflets“, page 83 and the<br />
following.<br />
ControlTerminal <strong>Flamenco</strong>,<br />
ControlTerminal with doorplate<br />
<strong>Flamenco</strong>: Refer to<br />
online help inclu<strong>de</strong>d with<br />
the ControlTerminal Config‐<br />
Set (or<strong>de</strong>r no. 77 0920 00).<br />
Page 63 and the following.<br />
8. Connecting the OSY-ControlCenter Refer to chapter “Product<br />
leaflets“, page 83 and the<br />
following.<br />
9. Commissioning the OSY-ControlCenter Refer to chapter “Product<br />
leaflets“, page 83 and the<br />
following.<br />
10. Commissioning the ward console<br />
(ComStation BUS-C , ComStation PC , ComStation CT<br />
<strong>Flamenco</strong>) or ComStation T <strong>Flamenco</strong><br />
11. Connecting and commissioning the Management‐<br />
Center<br />
Refer to the documents<br />
<strong>de</strong>livered with the ward console.<br />
Refer to chapter “Product<br />
leaflets“, page 83 and the<br />
following.<br />
12. Functional check of the system Page 69 and the following.<br />
<strong>Flamenco</strong> - <strong>Technical</strong> <strong>Manual</strong>, 04/13 (Rev. <strong>6.0</strong>), 00 8812 60<br />
41