13.10.2014 Views

NZ4202 - Unitec

NZ4202 - Unitec

NZ4202 - Unitec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SNZ NZS*4202 95 W 8583169 0042473 8T3 M<br />

NZS 4202: 1 995 Issued June 1995<br />

SECTION 2 - DEMOLITION<br />

2.1 OVERVIEW<br />

Refertosection O, General rules, which shall be read in conjunction with this section.<br />

2.2 PREAMBLES<br />

2.2.1<br />

Particulars shall be given of:<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

Any exceptional circumstances relating to the works;<br />

Any special conditions affecting demolition work, particularly with reference<br />

to safety, health, nuisance, bylaws and regulations;<br />

Any condition with respect to salvaged or other materials and the ownership<br />

the reof;<br />

The general method of storage or disposal of salvaged or other materials;<br />

Inspections or reports on the existing premises;<br />

Specified measures to be taken to protect existing works or premises on site<br />

or adjoining properties.<br />

2.2.2 Rates to include<br />

(a)<br />

Removing all demolished materials, rubbish and debris;<br />

--`,,``,,,,,,``,``,`,,,`,,,`,-`-`,,`,,`,`,,`---<br />

(b)<br />

2.3 GENERAL PRINCIPLES<br />

Temporary shoring and the like and its removal. Where shoring is measured<br />

separately this shall be stated.<br />

2.3.1<br />

The rules for detailed demolition given hereinafter apply to alterations to an existing<br />

building. Where complete structures are to be demolished one item only may be<br />

scheduled which shall include a description of the structure stating its dimensions,<br />

number of storeys, nature of its general construction and any other appropriate<br />

information.<br />

2.3.2<br />

An item shall be scheduled for obtaining all necessary approvals.<br />

2.3.3<br />

Disconnecting and sealing off services shall be enumerated, the work for each<br />

service being scheduled separately.<br />

2.3.4<br />

Provision of temporary hoardings, screens, dust sheets and the like shall be<br />

scheduled stating areas, lengths, heights or other information where specified.<br />

2.3.5<br />

Demolition items, whilst adhering to the principles of measurement of new work<br />

generally, shall be scheduled with such sizes and descriptions as shall convey the<br />

nature and extent of the work involved.<br />

2-1<br />

Copyright Standards New Zealand<br />

Provided by IHS under license with SNZ<br />

Document provided by IHS Licensee=<strong>Unitec</strong> Inst of Technology/5911177001,<br />

03/02/2005 18:31:52 MST Questions or comments about this message: please call<br />

the Document Policy Group at 303-397-2295.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!