13.10.2014 Views

NZ4202 - Unitec

NZ4202 - Unitec

NZ4202 - Unitec

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SNZ NZS*4202 95 H 8583169 0042533 979 M<br />

NZS 4202: 1 995 Issued June 1995<br />

24.4.5<br />

Pipework including bedding and haunching shall be measured in stages of 1.5 m in<br />

depth. Vertical pipework shall be measured separately.<br />

24.4.6<br />

Connections to existing sewers and drains shall be enumerated. The description<br />

shall include the depth and all necessary excavation and size and type of connections.<br />

24.4.7<br />

Connections to plumbing, soil, waste pipes and the like shall be enumerated.<br />

24.4.8<br />

Junctions, bends, inspection bends, inspection pipes, and the likeshall be enumerated<br />

as extra value over ordinary pipework.<br />

24.4.9<br />

Gullytraps, Buchantraps, greasetraps, yardsumps, andthe likeshall beenumerated.<br />

Excavation, concrete surrounds, gratings and connections todrains, where required,<br />

shall be included in the description of the item.<br />

24.4.10<br />

Covers and surrounds to drains shall be measured in metres. Reinforcement shall<br />

be measured by mass in accordance with section 9.<br />

24.4.1 1<br />

Manholes, inspection chambers, septic tanks, cesspits, and the like shall be<br />

enumerated giving internal size and depth to invert.<br />

The description shall include excavation, pipes, channels and the like. Detailed<br />

quantities shall be measured where the above are of an unusual construction or size.<br />

24.4.12<br />

Sump pumps, macerator pumps and the like shall be enumerated. The description<br />

shall include details of ratings, switching, floats etc. and for supports and lifting<br />

requirements. Wiring connections and controls are to be measured in section 28.<br />

24.4.1 3 General<br />

24.4.13.1<br />

An item shall be scheduled for obtaining all necessary approvals.<br />

24.4.13.2<br />

An item shall be scheduled for as-built drawings.<br />

24.4.1 3.3<br />

An item shall be scheduled for testing.<br />

24-2<br />

Copyright Standards New Zealand<br />

Provided by IHS under license with SNZ<br />

--`,,``,,,,,,``,``,`,,,`,,,`,-`-`,,`,,`,`,,`---<br />

Document provided by IHS Licensee=<strong>Unitec</strong> Inst of Technology/5911177001,<br />

03/02/2005 18:31:52 MST Questions or comments about this message: please call<br />

the Document Policy Group at 303-397-2295.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!