20.10.2014 Views

Strategic Action Plan - International Environmental Technology Centre

Strategic Action Plan - International Environmental Technology Centre

Strategic Action Plan - International Environmental Technology Centre

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Strategic</strong> <strong>Action</strong> <strong>Plan</strong> Report<br />

6.1 Characteristics of the Proposed Schemes<br />

The Schemes for <strong>Strategic</strong> <strong>Action</strong> <strong>Plan</strong> were generated to support the goals and objectives (see Table 6.1)<br />

Table 6.1: Goals and objectives for ISWM <strong>Plan</strong><br />

Goal 1<br />

Reduce Risk to Public<br />

Health and Ecosystems<br />

Objective 1 Minimize human<br />

exposure to solid wastes<br />

(G1O1)<br />

Objective 2 Minimize exposure of<br />

environmental<br />

components (air, water,<br />

soil, flora and fauna) to<br />

solid wastes<br />

(G1O2)<br />

Objective 3 Minimize the quantum of<br />

solid waste generated,<br />

transported, treated and<br />

disposed<br />

(G1O3)<br />

Objective 4<br />

Goal 2<br />

Achieve Compliance<br />

with solid waste related<br />

regulatory requirements<br />

Achieve Compliance with<br />

MSW (M&H) Rules<br />

(G2O1)<br />

Achieve Compliance with<br />

Biomedical (M&H) Rules<br />

(G2O2)<br />

Achieve Compliance with<br />

Hazardous Waste (M&H)<br />

Rules<br />

(G2O3)<br />

Achieve Compliance with<br />

Other Legislation (Plastic<br />

recycling, Batteries etc.)<br />

(G2O4)<br />

Table 6.2 provides listing of the various Schemes with linkages to Goals and Objectives.<br />

Goal 3<br />

Strengthen PMC in order<br />

to achieve the above goals<br />

Build internal capacity of<br />

human resources in terms of<br />

adequacy and competency<br />

(G3O1)<br />

Improve internal SWM<br />

infrastructure<br />

(G3O2)<br />

Make operations of SWM<br />

department transparent,<br />

accountable, efficient and<br />

cost-effective<br />

(G3O3)<br />

Forge synergistic<br />

partnerships with<br />

stakeholders<br />

(G3O4)<br />

In order to categorise the Schemes at operational level, five themes were identified based on the “functional<br />

nature”. These themes include,<br />

• Assessment and Development<br />

• 3R Initiatives<br />

• Infrastructure Development<br />

• Awareness and Promotion<br />

• Capacity Building and Partnerships<br />

Such a thematic classification of Schemes is shown in Table 6.2 and Figure 6.2.<br />

ISWM <strong>Plan</strong> for Pune 113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!