20.10.2014 Views

Strategic Action Plan - International Environmental Technology Centre

Strategic Action Plan - International Environmental Technology Centre

Strategic Action Plan - International Environmental Technology Centre

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IMPROVING HEALTH AND SAFETY OF PMC<br />

WORKERS, RAG PICKERS AND CITIZENS IN<br />

PROXIMITY WITH THE LANDFILL<br />

Target: To introduce programme for improving the health and safety of PMC workers, rag<br />

pickers and citizens in proximity with the landfill.<br />

Lead Agency: PMC, NGOs working with the rag pickers.<br />

Support Agency: PMC, NGOs working with the rag pickers.<br />

Location (Suggested): All those locations where the PMC Workers come in contact with<br />

waste management including while collection, at the transfer station and at the landfill.<br />

Special attention should be given at the Community Sorting <strong>Centre</strong>s<br />

Description: An assessment should be carried out to<br />

• Identify and understand the health and safety issues faced by the PMC workers and rag<br />

pickers.<br />

• Assist with the injuries and illness prevention efforts<br />

• Help investigate the underlying causes of injuries<br />

• Help find and implement solutions to health and safety problems<br />

• Provision of health and safety equipment for PMC workers and rag pickers<br />

• Impart training for safe procedure for handling of wastes.<br />

Assessment for the health and safety issues near the landfill should address Pest<br />

Control, Litter Control, Fire Control, Dust Control, Odour Control, Site Safety, Leachate<br />

Management<br />

Responsibility of PMC:<br />

• PMC should impart training to the rag pickers and PMC workers regarding safety<br />

measures<br />

• Protective equipment should be supplied to the workers<br />

• Regular health checkups should be done at the municipal hospitals<br />

• Medical insurance should be provided<br />

Budget (Estimated): 1 Million<br />

Timeframe (Estimated): 1 year<br />

CAPACITY<br />

BUILDING &<br />

PARTNERSHIPS<br />

SCHEME 7<br />

PROGRAMME<br />

G1 – O1 and G1-O2<br />

Links to other ISWM<br />

Pune Schemes:<br />

‣ Assessment of<br />

Existing Waste Disposal<br />

Sites and Evaluating<br />

Management Options<br />

‣ Identification of<br />

New Waste Disposal<br />

Sites<br />

‣ Establishment of<br />

Community Sorting<br />

<strong>Centre</strong>s<br />

‣ Optimizing and<br />

Strengthening of MSW<br />

Collection systems<br />

‣ Formation of<br />

<strong>Environmental</strong><br />

Awareness <strong>Centre</strong><br />

‣ Strengthening of<br />

PMC Rag picker cooperatives<br />

‣ Formation of a<br />

cadre of certified<br />

operators<br />

for<br />

decentralized treatment<br />

Benefits:<br />

• Safe working<br />

conditions for rag<br />

pickers and PMC<br />

Workers<br />

• Provision of<br />

protective<br />

equipment<br />

• Indirectly Avoiding<br />

spread of diseases<br />

etc.<br />

• Practice of safe<br />

disposal methods<br />

ISWM <strong>Plan</strong> for Pune 186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!